Military’s Filthy 50 sites contaminated with ‘forever chemicals’ haven’t started cleanup

The military has not begun cleanups at any of the 50 Department of Defense sites Congress has identified as highly contaminated with the “forever chemicals” known as PFAS – and it could be years before cleanups are complete.

Congress set a May 2022 deadline for the DOD to report on the cleanup status of these bases, the Filthy 50, with extremely high levels of PFAS contamination. The Pentagon has not yet announced that it has completed the report.

EWG conducted its own analysis of DOD documents to assess the status of the cleanups. It finds that, in many cases, an average of six years have passed between the date contamination was first suspected at a base and when the Pentagon started even drafting cleanup plans.

The DOD has made some progress in addressing PFAS contamination at these highly contaminated sites, but it has been slow, and there is a long road ahead. All 50 sites have completed or are conducting preliminary assessments, or PAs, and site inspections, or SIs, and they have all launched remedial investigations, or RIs. None have started formal cleanups. 

Filthy 50 military base cleanup status summary[1]

  • The PA/SI has been completed and the RI is underway at 14 installations.
  • The PA/SI and RI are underway at 22 installations.
  • The PA/SI has been completed and the RI has been planned at 12 installations.
Image
Filthy 50 chart

Source: EWG, from Department of Defense Manual, March 2012

The RI stage comes early in the cleanup process outlined in the Comprehensive Environmental Response, Compensation, and Liability Act, also known as the Superfund law. It’s when the extent of PFAS contamination is determined, setting the stage for cleanup.

It has been a long process even to get to the RI stage. As DOD officials have testified, it could be decades before cleanup at these sites is complete. 

Filthy 50 Department of Defense bases

Status (as of March 31, 2022)

Alaska

Eielson Air Force Base

PA*/SI* completed – RI* underway

Galena Air Force Base

PA/SI completed – RI underway

Arkansas

Eaker Air Force Base

PA/SI completed – RI planned

California

Edwards Air Force Base

PA/SI and RI underway

Naval Air Weapons Station China Lake

PA/SI and RI underway

Vandenberg Air Force Base

PA/SI and RI underway

Travis Air Force Base

PA/SI and RI underway

Marine Corps Air Station Tustin

PA/SI completed – RI underway

Naval Air Station Alameda

PA/SI and RI underway

Colorado

Buckley Air Force Base

PA/SI and RI underway

Delaware

Dover Air Force Base

PA/SI and RI underway

Florida

Tyndall Air Force Base

PA/SI and RI underway

Patrick Air Force Base

PA/SI completed – RI planned

Naval Air Station Jacksonville

PA/SI and RI underway

Georgia

Robins Air Force Base

PA/SI completed – RI planned

Illinois

Chanute Air Force Base

PA/SI completed – RI planned

Iowa

Iowa Air National Guard Base

PA/SI completed – RI planned

Louisiana

Barksdale Air Force Base

PA/SI and RI underway

England Air Force Base

PA/SI completed – RI planned

Maryland

Joint Base Andrews

PA/SI completed – RI underway

Naval Research Laboratory Chesapeake Bay Detachment

PA/SI and RI underway

Massachusetts

Westover Air Reserve Base

PA/SI completed – RI planned

Michigan

Wurtsmith Air Force Base

PA/SI completed – RI underway

K.I. Sawyer Air Force Base

PA/SI completed – RI underway

Mississippi

Columbus Air Force Base

PA/SI and RI underway

Missouri

Whiteman Air Force Base

PA/SI completed – RI underway

Rosecrans Air National Guard Base

PA/SI completed – RI planned

Nevada

Nevada Air National Guard Base

PA/SI completed – RI planned

New Hampshire

Pease Air Force Base

PA/SI completed – RI underway

New Jersey

Joint Base McGuire-Dix-Lakehurst

PA/SI and RI underway

New York

Plattsburgh Air Force Base

PA/SI completed – RI underway

Stewart Air National Guard Base

PA/SI and RI underway

Hancock Field Air National Guard Base

PA/SI completed – RI planned

Niagara Falls Air Reserve Station

PA/SI completed – RI planned

North Dakota

Minot Air Force Base

PA/SI and RI underway

Oklahoma

Tinker Air Force Base

PA/SI completed – RI underway

Altus Air Force Base

PA/SI completed – RI underway

Vance Air Force Base

PA/SI and RI underway

Pennsylvania

Horsham Air Guard Station

PA/SI and RI underway

South Carolina

Charleston Air Force Base

PA/SI completed – RI underway

Myrtle Beach Air Force Base

PA/SI completed – RI underway

South Dakota

Ellsworth Air Force Base

PA/SI completed – RI underway

Tennessee

Arnold Air Force Base

PA/SI and RI underway

Texas

Sheppard Air Force Base

PA/SI and RI underway

Grand Prairie Armed Forces Reserve Complex (NAS Dallas)

PA/SI and RI underway

Virginia

Langley Air Force Base

PA/SI completed – RI planned

Washington

Fairchild Air Force Base

PA/SI completed – RI underway

Naval Air Station Whidbey Island

PA/SI and RI underway

West Virginia

Shepherd Field Air National Guard Base

PA/SI and RI underway

Wyoming

F.E. Warren Air Force Base

PA/SI completed – RI underway

A review of available documents from each site reveals that it has taken the DOD nearly three years, on average, to complete each of the two previous stages in the cleanup process.

The first stage – testing soil and water to see whether the site is contaminated with PFAS – took an average of nearly two years and 11 months to complete.

The DOD then took an average two years and 8 months for the next stage, starting to draft a plan for cleaning up PFAS contamination it identified.

If the Pentagon sticks to the same timeline for the third stage, the actual cleanup work, the typical Filthy 50 site will have had known contamination for at least 10 years, with little work done to clean it up. That leaves service members, their families and surrounding communities potentially exposed to these toxic forever chemicals for years and years.

PFAS have been confirmed in the ground or drinking water of nearly 400 military installations and are suspected to be present at hundreds of other sites. DOD installations are required to provide water filters or connect nearby residents with public water supplies if PFAS levels exceed the Environmental Protection Agency’s advisory level of 70 parts per trillion. As of spring 2022, the department is providing alternative water or filtration for private or public systems outside of 53 military installations.

PFAS contamination at DOD sites is caused mostly by the use of firefighting foam made with PFAS. In the 2020 National Defense Authorization Act, Congress directed the DOD to end the use of foam made with PFAS. DOD officials testified last month that a more effective, PFAS-free foam will soon be available.

Last year, Congress provided more than $200 million for PFAS cleanup efforts at military installations and directed the DOD to provide a cleanup schedule by the end of October.

The Environmental Protection Agency is expected to lower the advisory level for PFOA and PFOS – two of the most notorious PFAS – in the coming months, and to set advisory levels for two other PFAS commonly found on military installations. The EPA has also pledged to set a mandatory drinking water standard for PFOA and PFOS by the end of 2023.

After the EPA sets the new advisories, DOD officials have said the Pentagon must reassess bases across the country to determine their contamination status. If the EPA lowers the advisories, more funding will be needed to make sure that drinking water used by service members and surrounding communities is safe to drink.


[1]PA/SI completed and RI underway

The base actively working on developing a cleanup strategy.

PA/SI and RI underway              

The base is actively working on developing a cleanup strategy, while at the same time conducting a wider investigation into PFAS contamination on or around the base. Usually, bases with this status are conducting an "Expanded Site Investigation," meaning they realized the contamination has likely spread farther than initially believed.

PA/SI completed and RI planned

Investigations determined there is a need to continue with the cleanup process and develop a strategy for it.